Responsible for the planning of new site/production lines, capacity design, and on-site lean improvement. Through systematic industrial engineering (IE) methods, enhance efficiency, reduce costs, optimize processes, and achieve efficient and stable operation of the production system.
Continue to deploy Industry 4.0 applications in factory to improve produciton efficiency. Such as Autonomous Robots,Simulation, Sys. Intergration,etc. Lead factory layout and production line design, including workflow, material flow, and workstation design. Develop and maintain capacity models (manpower, equipment, cycle time) to support NPI and production ramp-up. Identify capacity constraints and drive line balancing and cycle time optimization. Apply IE methodologies (Time Study, MOST, LBR, etc.) to continuously improve operational efficiency. Drive Lean initiatives to systematically identify and eliminate the 8 wastes across production processes. Lead optimization of assembly processes (tightening, assembly, welding, etc.) and familiar with PCBA processes. Participate in evaluation and implementation of non-standard automation solutions and advanced manufacturing technologies. Establish and leverage IE data systems to conduct capacity forecasting and scenario analysis,monitor KPI goals, such as OEE, cost out , enabling proactive planning and cost optimization decisions. Lead the execution of new factory and production line setup projects to ensure effective implementation of design concepts Collaborate cross-functionally (Production, Quality, Engineering, Supply Chain) to drive key improvement initiatives and achieve operational targets. Lead RIE projects such as VSM,SW/5S+Safety prioritization in new Tech., to fully cover overall cycle, including pre-study, assessment, introduction and execution.